Supplier due diligence usually comes down to one question: does this company actually make the material? Everything on this page exists to answer it.
- Jaw crusher
- 40–50 TPH
- Screen decks
- 4
- Operation
- 24 / 7
- Own fleet
- 10 trucks
Process
Mine face to despatch.
Seven stages, six commissioned. The washing and attrition stage is in development and marked as such — it is not part of what we can supply against today.
- 01
Extraction
Quartz ore from the company-held lease at Nalgonda
- 02
Grizzly feed
Oversize pre-screened out
- 03
Jaw crushing
Primary reduction, 40–50 TPH
- 04
HSI / VSI
Secondary reduction and grain shaping
- 05
Screening
Four-way vibratory classification
- 06
Washing & attrition
Stage 2 — in development
Not yet commissioned
- 07
Despatch
Company-owned fleet, jumbo bag or bulk
- 08Your intakeCertificate travels with the load
Plant schedule
The machinery.
Installed equipment at the plant. Ask for nameplate photographs or a walk-through if your audit needs them.
Grizzly Feeder
0112′ × 3′ (3660 × 915 mm) · 15 HP
Pre-screens oversize ahead of primary crushing
Jaw Crusher
0248″ × 9″ (1200 × 225 mm) · 40–50 TPH · 60 HP
Primary crushing
Horizontal Shaft Impactor
03Secondary and tertiary reduction
Vertical Shaft Impactor
04Final reduction and grain shaping
Belt Conveyor
0536″
Inter-stage material transport



Capacity
Runningcontinuously.
The plant runs around the clock on a dedicated power provision, with on-site quarters for the workforce. Continuous operation is what makes a repeat monthly commitment realistic rather than aspirational.
- Monthly capacity
- ~10,000 MTAcross the screening lines, running continuously
- Operating model
- 24/7Dedicated electricity provision for continuous operation
- On-site quarters
- 100Workforce housing capacity
- Trucks
- 10Company-owned delivery fleet
- Installed motor capacity
- 65 HP
- Air compressor
- Installed
- Vibrator units
- Installed
- Power
- Dedicated provision for continuous operation
Sites & reach
Two sites.One road to you.
The mine and plant sit together at Chakalisherpally; commercial enquiries run through the registered office in Hyderabad.
Mine & processing plant
Registered office
| Destination | Road km | Transit |
|---|---|---|
| HyderabadTelangana | ~75 | Same day |
| VijayawadaAndhra Pradesh | ~210 | 1 day |
| VisakhapatnamAndhra Pradesh | ~560 | 2 days |
| NagpurMaharashtra | ~520 | 2 days |
| PuneMaharashtra | ~640 | 2 days |
| BengaluruKarnataka | ~600 | 2 days |
| ChennaiTamil Nadu | ~650 | 2 days |
Indicative door-to-door times on our own fleet, loaded at the plant. Confirmed against your delivery window at order.
Enquiries · reply within one business day
Auditing us as a supplier?
We are glad to walk a buyer through the plant, on site or over a call. Ask for whatever documentation your process needs.