Skip to content
Crushing circuit — vertical shaft impactor and screening tower linked by conveyors, stockpiles at the base

Facility & Capacity

A producer,not an intermediary.

Supplier due diligence usually comes down to one question: does this company actually make the material? Everything on this page exists to answer it.

Jaw crusher
40–50 TPH
Screen decks
4
Operation
24 / 7
Own fleet
10 trucks
01

Process

Mine face to despatch.

Seven stages, six commissioned. The washing and attrition stage is in development and marked as such — it is not part of what we can supply against today.

  1. 01

    Extraction

    Quartz ore from the company-held lease at Nalgonda

  2. 02

    Grizzly feed

    Oversize pre-screened out

  3. 03

    Jaw crushing

    Primary reduction, 40–50 TPH

  4. 04

    HSI / VSI

    Secondary reduction and grain shaping

  5. 05

    Screening

    Four-way vibratory classification

  6. 06

    Washing & attrition

    Stage 2 — in development

    Not yet commissioned

  7. 07

    Despatch

    Company-owned fleet, jumbo bag or bulk

  8. 08Your intakeCertificate travels with the load
02

Plant schedule

The machinery.

Installed equipment at the plant. Ask for nameplate photographs or a walk-through if your audit needs them.

Grizzly Feeder

01

12′ × 3′ (3660 × 915 mm) · 15 HP

Pre-screens oversize ahead of primary crushing

Jaw Crusher

02

48″ × 9″ (1200 × 225 mm) · 40–50 TPH · 60 HP

Primary crushing

Horizontal Shaft Impactor

03

Secondary and tertiary reduction

Vertical Shaft Impactor

04

Final reduction and grain shaping

Belt Conveyor

05

36″

Inter-stage material transport

Aerial view of a working sand quarry, showing benched extraction faces and haul roads
Extraction benches
Crushing circuit — vertical shaft impactor and screening tower linked by conveyors, stockpiles at the base
Impact crushing & screening
Tracked crushing plant discharging onto a stockpile, dust rising off the conveyor
Primary crushing
03

Capacity

Runningcontinuously.

The plant runs around the clock on a dedicated power provision, with on-site quarters for the workforce. Continuous operation is what makes a repeat monthly commitment realistic rather than aspirational.

Monthly capacity
~10,000 MTAcross the screening lines, running continuously
Operating model
24/7Dedicated electricity provision for continuous operation
On-site quarters
100Workforce housing capacity
Trucks
10Company-owned delivery fleet
Installed motor capacity
65 HP
Air compressor
Installed
Vibrator units
Installed
Power
Dedicated provision for continuous operation
04

Sites & reach

Two sites.One road to you.

The mine and plant sit together at Chakalisherpally; commercial enquiries run through the registered office in Hyderabad.

Mine & processing plant

Sy. No. 11/E, Chakalisherpally Village
Chintapally Mandal, Nalgonda District
Telangana – 508245
India
Open in Maps ↗

Registered office

3rd Floor, Above SBI Bank
Saraswathi Nagar, Saidabad
Hyderabad – 500059
Telangana, India
Open in Maps ↗
Vijayawada1 dayVisakhapatnam2 daysNagpur2 daysPune2 daysBengaluru2 daysChennai2 daysHyderabadOffice · same dayMine & plantChakalisherpally
DestinationRoad kmTransit
HyderabadTelangana~75Same day
VijayawadaAndhra Pradesh~2101 day
VisakhapatnamAndhra Pradesh~5602 days
NagpurMaharashtra~5202 days
PuneMaharashtra~6402 days
BengaluruKarnataka~6002 days
ChennaiTamil Nadu~6502 days

Indicative door-to-door times on our own fleet, loaded at the plant. Confirmed against your delivery window at order.

Enquiries · reply within one business day

Auditing us as a supplier?

We are glad to walk a buyer through the plant, on site or over a call. Ask for whatever documentation your process needs.

Arrange a visit
Message us on WhatsApp